SESAR Solutions - Remote tower for single airport
7. VALP
Aprašas
The present document is the Validation Plan for the V2 and V3 Single Remote Tower validation activities of P06.09.03. It describes three activities that contribute to the validation of the Single Remote Tower application: · Single TWR Trial 1 – a V2 Passive Shadow Mode (PSM) trial assessing a basic technical and operational concept for Remote Provision of ATS to a single aerodrome; · Single TWR Trial 2 – a V3 passive shadow mode trial progressing the technical and operational capability; · Single AFIS Trail 1 – a V3 PSM and Advanced Shadow Mode (ASM) trial assessing the Remote Provision of ATS to a single AFIS aerodrome in a range of operational conditions.
Formatas
Papildoma informacija
- Access URL
- http://www.sesarju.eu/sites/default/files/solutions/7_Single_Remote_Tower_VALP.pdf?issuusl=ignore
- Būsena
- baigtas
- Paskelbimo data
- 2016-01-21
- Ištekliaus tipas
- Rinkmena, kurią galima parsisiųsti